Skip to content

Search results

Filter Site

276 results

91. Testing

- TESTING OF SOILS AND AGGREGATES Ip. Test Description Method 1 Petrographic description of the aggregate PN-EN 932-3:1999+A1:2004 2 Macroscopic…
Presse

92. PORR begins widening the 19th-century tunnel in Trzcińsk

- Warsaw, May 11, 2023 - With the use of modern technology, the drilling of a railway tunnel near Trzcińsk has begun. The "TEM" machine will ensure efficient work at safe train crossings. The…
Presse

93. The second stage of the Włoszczowa bypass for PORR

- Warsaw, May 2, 2023 - PORR S.A. signed a contract with the Świętokrzyskie Provincial Roads Authority in Kielce for the construction of the second stage of the Włoszczowa bypass along the provincial…
Presse

94. Topping out on the building of the Medical Simulation Center

- Warsaw, April 18, 2023 - PORR has completed the first stage of construction of the new university didactic center of the Medical University of Warsaw. The Medical Simulation Center is being built in…

95. 230412 EcoVadis EN

- 230412 EcoVadis EN 230412 EcoVadis EN Press Release ESG leader in the construction industry PORR awarded Silver in EcoVadis rating Vienna, 12.04.2023 – PORR has been awarded the silver medal by…
Presse

96. PORR awarded Silver in EcoVadis rating

- Vienna, 12.04.2023 – PORR has been awarded the silver medal by the internationally recognised sustainability rating agency EcoVadis. This puts PORR among the top performers in the construction…

97. 230404 PA Brenner Basistunnel H53 EN

- 230404 PA Brenner Basistunnel H53 EN 230404 PA Brenner Basistunnel H53 EN Press Release Additional order for Brenner Base Tunnel Contract awarded for lot “H53 PfonsBrenner” Vienna, 04.04.2023 –…
Presse

98. Contract awarded for lot “H53 Pfons-Brenner”

- Vienna, 04.04.2023 – This is the largest construction lot in Austrian history: The construction company BBT SE has awarded the contract for the construction of the Pfons-Brenner tunnel section to a…
Presse

99. PORR with top results for 2022

- Record order backlog of EUR 8.2 bn Sharp rise in production output and revenue EBT up by around 30% to EUR 110.0m Strong balance sheet with net cash and high liquidity Positive outlook for…

100. 230330 PORR FY FINAL en

- 230330 PORR FY FINAL en 230330 PORR FY FINAL en Press Release PORR with top results for 2022 • • • • • Record order backlog of EUR 8.2 bn Sharp rise in production output and revenue EBT up by…
Search results 91 until 100 of 276